Att_ATTACHMENT C - Proposed Changes to Current IRIS Grant Reporting System - 2009

Att_ATTACHMENT C - Proposed Changes to Current IRIS Grant Reporting System - 2009.pdf

IEPS International Resource Information System (IRIS)

Att_ATTACHMENT C - Proposed Changes to Current IRIS Grant Reporting System - 2009

OMB: 1840-0759

Document [pdf]
Download: pdf | pdf
ATTACHMENT C

PROPOSED CHANGES TO
CURRENT INTERNATIONAL
RESOURCE INFORMATION
SYSTEM (IRIS) GRANT REPORTING
SYSTEM

PROPOSED CHANGES TO CURRENT INTERNATIONAL RESOURCE INFORMATION SYSTEM (IRIS) GRANT
REPORTING SYSTEM
The following spreadsheet outlines proposed changes to the IRIS system. Individual screens are listed for each program, noting who uses the screen, what type of change is proposed, the specific
fields added or removed, changes made to the dropdown menu selections, and which report(s) the information is entered for during the grant cycle.

The users included under the User Type column include Project Directors, Fellows, Participants, Domestic Institution, and Administering Agency. Project Directors are the primary managers of the
grants, responsible for overseeing the project activities, fellow activities (if applicable), and for budget management. Fellows receive fellowships from a funded institution to conduct overseas research
or to take language and area studies courses. Participants (generally faculty, teachers, or students) travel with a group for the Seminars Abroad Program (SA) or the Group Projects Abroad Program
(GPA), with travel and lodging expenses covered by the funded institution. Domestic institutions receive funding for the SA program to conduct a pre-departure orientation in the U.S. prior to the
seminar, and manage the budget for the orientation. Administering agencies conduct the SA program in the host country(ies), and manage the budget for the seminar.

The reports included under the Report Type column are the non-competitive continuation (NCC) reports, interim reports, and final reports. For the purposes of this spreadsheet, NCC reports are those
submitted in the spring, which are then used to make NCC awards. Interim reports are those submitted in the fall or winter throughout the duration of the grant, two months after the anniversary of the
grant start date. Final reports are due within 90 days of the grant end date.
Program

AORC

The American Overseas Research Centers program provides grants to consortia United States institutions of higher education to establish or operate overseas research centers that promote postgraduate
research, exchanges, and area studies. AORC grants may be used to pay for all or a portion of the cost of establishing or operating a center or program, including the cost of faculty and staff stipends and
salaries, faculty, staff and student travel, the operation and maintenance of overseas facilities, the cost of teaching and research materials, the cost of acquisition, maintenance and preservation of library
collections, the cost of bringing visiting scholars and faculty to a center to teach or to conduct research, the cost of organizing and managing conferences, and the cost of publication and dissemination of
material for the scholarly and general public.

Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

Changed

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type

As needed

1

Program

AORC

Add a User

Project Director

New

Travel Approval Request (TAR)
Add a TAR
Report Schedule

Project Director
Project Director
Project Director

None
None
Changed

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

Abstract

Project Director

Removed

Status/Impact

Project Director

Removed

Replaced by "Objectives and Accomplishments".

NCC, Interim, Final

Objectives and Accomplishments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Collaboration Activities

Project Director

Changed

Renamed "Collaboration Activities" with the following
instructions: " Describe collaboration activities
conducted with other Title VI or Fulbright-Hays
program grantees during the current reporting
period. Elaborate on the purpose of the activity, the
impact on the constituents, and why it was an
effective collaboration."

NCC, Interim, Final

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

2

Proposed Changed to Current IRIS System

User name, Email, and Title

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Dropdown added for Title.

As needed
As needed
As needed
NCC, Interim, Final

Final

NCC, Interim, Final
NCC (first only)

Program

AORC

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

Center Information

Project Director

None

Interim, Final

Center Contact Information

Project Director

None

Interim, Final

Researcher Profiles

Project Director

None

Interim, Final

Add a Researcher Profile

Project Director

None

Center Activities and Facilitative
Services

Project Director

Changed

Proposed Changed to Current IRIS System

Interim, Final
Title changed to "Center Activities and Facilitative
Services" with new categories: Archives / Libraries;
Conferences; Cultural events (Art exhibits, Museum
tours, etc); Guided Tours Related to Research
Project; Information Technology - Computer,
Internet, telephone; Language Program; Lectures
and seminars; Lodging; Research; Travel. Required
attachment upload field added for "Customer
Satisfaction Survey".

Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

3

Program

AORC

BIE

Publications and Research
Presentations

Project Director

Changed

Sources of Funding

Project Director

Removed

Sources of U.S. Funding

Project Director

New

View / Submit Report

Project Director

None

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

Interim, Final

Interim, Final
This new screen consists of three new columns:
U.S. Private Source; U.S. Public Source; Total.
Several Center Activity categories have been
added: Conferences: logistical; co-sponsorship;
Conferences: professional services fees; Cultural
events: exhibits; guided tours; External Evaluation;
Information Technology; Language program; Library
acquisitions; special collections; Overseas Center:
Facilities; Overseas Center: Staff; Publications:
production and dissemination.

Interim, Final

Interim, Final

This program provides funds to institutions of higher education that enter into an agreement with a trade association and/or business for two purposes: to improve the academic teaching of the business
curriculum and to conduct outreach activities that expand the capacity of the business community to engage in international economic activities. The purpose of the program is to promote education and
training that will contribute to the ability of United States business to prosper in an international economy.
Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Director

None

Project Information

Project Director

Changed

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

"Partner Web site" added below Email, Web Site.

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Entered when grant
is set up in system

4

Program

BIE

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Director

New

User name, Email, and Title

Travel Approval Request (TAR)

Project Director

None

Add a TAR

Project Director

None

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Objectives and Accomplishments

Project Directors

New

Objectives

Project Directors

Combined Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Accomplishments

Project Directors

Combined Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

5

Proposed Changed to Current IRIS System

As needed

Dropdown added for Title.

As needed
As needed
As needed
NCC, Interim, Final

Final

NCC (first only)
"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Program

BIE

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Director's Assessment

Project Director

Removed

Replaced by "Evaluation"

NCC, Interim, Final

Next Project Year

Project Director

Removed

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

International Business (IB)
Programs Created or Enhanced
International Business (IB) Courses
Created or Enhanced
International Business (IB) Courses
and Programs Created or
Enhanced
Add an IB Course or Program

Project Director

Project Director

New

International Business
Faculty/Instructor Positions

Project Director

None

Interim, Final

Add an IB Faculty / Instructor
Position

Project Director

None

Interim, Final

Faculty Enhancement

Project Director

None

Interim, Final

Enhancement of Faculty Expertise

Project Director

None

Interim, Final

Outreach Activities

Project Director

None

Interim, Final

Add an Outreach Activity

Project Director

Changed

Outreach Defaults

Project Director

None

Interim, Final

Study Abroad and Internship
Programs Created or Enhanced

Project Director

None

Interim, Final

Proposed Changed to Current IRIS System

Project Director
Project Director

NCC, Interim

Budget categories were modified to accommodate
carry over funds.
Combined Combined using the "IB Courses and Programs
Created or Enhanced" from the CIBE report.
Combined Combined using the "IB Courses and Programs
Created or Enhanced" from the CIBE report.
New
Combined using the "IB Courses and Programs
Created or Enhanced" from the CIBE report.
Following Funded by:, amount fields were added for
BIE funds / Matching funds amount; Web site:.

Following Funded by:, amount fields were added for
BIE funds / Matching funds amount; Web site:.

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

NCC, Interim, Final
Interim, Final
Interim, Final
Interim, Final
Interim, Final

Interim, Final

6

Program

BIE

CIBE

Add a Study Abroad or Internship
Program

Project Director

Changed

International Business Resource
Centers Created or Enhanced
Add an IB Resource Center

Project Director

Removed

Project Director

Removed

View / Submit Report

Project Director

None

Following Funded by:, amount fields were added for
BIE funds / Matching funds amount; Web site:.

Interim, Final

NCC, Interim, Final
Interim, Final
NCC, Interim, Final

This program provides funding to schools of business for curriculum development, research, and training on issues of importance to United States trade and competitiveness.

Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Directors

None

As needed

Project Information

Project Directors

None

entered when grant
is set up in system

Additional Users

Project Directors

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Directors

New

User name, Email, and Title

Travel Approval Request (TAR)

Project Directors

None

Add a TAR

Project Directors

None

Report Schedule

Project Directors

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Directors

Removed

Objectives and Accomplishments

Project Directors

New

Objectives

Project Directors

Combined Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Accomplishments

Project Directors

Combined Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type

As needed

Dropdown added for Title.

As needed
As needed
As needed
NCC, Interim, Final

Final

NCC (first only)
"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

NCC, Interim, Final

7

Program

CIBE

Adjustments to Project

Project Directors

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Directors

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Evaluation

Project Directors

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

Priorities

Project Directors

New

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Directors

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

International Business Courses by Project Directors
Discipline
International Business Courses and Project Directors
Programs Created or Enhanced

None

Interim, Final

None

Interim, Final

Add an International Business
Course or Program

Project Directors

Changed

Business Language Courses

Project Directors

None

Interim, Final

Program Graduates - Master's
Degrees

Project Directors

None

Interim, Final

Program Graduates - Doctoral
Degrees

Project Directors

None

Interim, Final

Proposed Changed to Current IRIS System

Following Funded by:, amount fields were added for
CIBE funds / Matching funds amount.

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim, Final

8

Program

CIBE

DDRA

Program Graduate Placements Master's Degrees

Project Directors

None

Interim, Final

Program Graduate Placements Doctoral Degrees
International Research Activities

Project Directors

None

Interim, Final

Project Directors

None

Interim, Final

Add an International Research
Activity

Project Directors

Changed

Following Funded by:, amount fields were added for
CIBE funds / Matching funds amount.

Interim, Final

Publications and Research
Presentations

Project Directors

Changed

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

Interim, Final

Collaboration

Project Directors

Changed

Title changed to "Collaboration"

Add a Collaboration

Project Directors

Changed

Following Funded by:, amount fields were added for
CIBE funds / Matching funds amount.

Professional Development Program Project Directors

Changed

Add a Professional Development
Program

Project Directors

Changed

Title changed to "Professional Development
Program"
Title changed to "Professional Development
Program"; Following Funded by:, amount fields were
added for CIBE funds / Matching funds amount.

Outreach Activities

Project Directors

None

Add an Outreach Activity

Project Directors

Changed

View / Submit Report

Project Directors

None

Interim, Final
Collaborator: Other CIBE;
U.S. Entity; Overseas Entity

Interim, Final

Interim, Final
Interim, Final

Interim, Final
Following Funded by:, amount fields were added for
CIBE funds / Matching funds amount; Web site:

Interim, Final

Interim, Final

This program provides grants to colleges and universities to fund individual doctoral students to conduct research in other countries in modern foreign languages and area studies for periods of 6 to 12
months.
Fellows use the following screens to report grant activity for a reporting period.

DDRA
Fellow

Screen

User Type

Changes

Fellow Information

Fellow

None

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type
Interim

9

Program

DDRA
Fellow

Abstract

Fellow

None

Interim

Pre-Fellowship Foreign Language
Self-Evaluation
Enter Pre Self-Evaluation

Fellow

None

Interim

Fellow

Changed

A completely new survey replaced the previous selfevaluation. The new survey is based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking, Reading, and Listening
proficiency.

Interim

Awarded Budget

Fellow

Changed

"Other Funds" column was added.

Interim

View / Submit Pre Report

Fellow

None

Interim

Research Results

Fellow

None

Final

Dissemination

Fellow

None

Final

Adjustments to Project

Fellow

None

Final

Project Support

Fellow

None

Advice for Future Fellows

Fellow

Removed

Replaced by "Feedback"

Final

Feedback

Fellow

New

Check box with the following text was added to the
former "Advice for Future Fellows" screen: "This
feedback will be shared with future fellows unless
you check here."

Final

Final

Post-Fellowship Foreign Language Fellow
Self-Evaluation
Enter Post Self-Evaluation
Fellow

None
Changed

A completely new survey replaced the previous selfevaluation. The new survey is based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking, Reading, and Listening
proficiency.

Final

Actual Budget

Fellow

Changed

"DDRA Funds Awarded" column was added.

Final

View / Submit Post Report

Fellow

None

Final

Final

Project directors use the following screens to report grant activity for a reporting period.

DDRA
Director

Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

None

Add a User

Project Director

New

User name, Email, and Title

Fellow Administration

Project Director

Changed

Update Fellow Information

Project Director

Changed

"Hiatus Request" column and "Create / Update"
button was added.
Research dates are now editable;
Time Extension button

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type

As needed
As needed
"Add a Fellow" button was
removed;

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

As needed
Final

10

Program

DDRA
Director

FLAS
Fellow

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Hiatus Request

Project Director

New

Fellow's Hiatus Travel Itinerary
Does the fellow have the appropriate insurance?
Does the fellow have the appropriate visas?
New end date of research period:

As needed

Grant Activation Request (GAR)

Project Director

Changed

Information buttons were added to provide onscreen guidance for various functions and specific
reporting requirements.

As needed

View / Submit Report

Project Director

None

Final

Final

This program provides academic year and summer fellowships to institutions of higher education to assist graduate students in foreign language and either area or international studies. The goals of the
fellowship program include: (1) to assist in the development of knowledge, resources, and trained personnel for modern foreign language and area/international studies; (2) to stimulate the attainment of
foreign language acquisition and fluency; and (3) to develop a pool of international experts to meet national needs.
Fellows use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Fellow Profile

Fellow

None

Education, Courses, and PostFellowship Activities

Fellow

Changed

Home Institution

Final

Foreign Language Self-Evaluation

Fellow

Changed

A completely new survey replaced the previous selfevaluation. The new survey is based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking, Reading, and Listening
proficiency.

Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

11

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
Final

Program

FLAS
Fellow

Fellowship Evaluation (only
completed by fellows not receiving
dissertation funding)

Fellow

Changed

New instructions: "You are required to provide
comments in this box and what you write will be
confidential and just shared with just the U.S.
Department of Education. In this box please write
about your impressions of the FLAS program you
participated in, specifically: Was the competition
announced frequently and in highly visible forums?
Were the application requirements clearly stated?
Were the administrators of the program ready to
assist during the application process and after you
received your award? How was the quality of the
language and area studies course offerings? What
suggestions do you have to improve your
institution’s FLAS program?” A check box with the
following text was also added: "Check here to share
with your Project Director and FLAS Coordinator."

Final

Dissertation Research(only
completed by fellows receiving
dissertation funding)

Fellow

None

Final

View / Submit Report

Fellow

None

Final

Project directors use the following screens to report grant activity for a reporting period.

FLAS
Director

Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Directors

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Directors

New

User name, Email, and Title

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type

As needed

Dropdown added for Title.

As needed
Interim, Final

12

Program

FLAS
Director

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Language Requests

Project Directors

Changed

An information button was added to provide onscreen guidance for various functions and specific
reporting requirements.

Add a Language Request

Project Director

None

Overseas Program Request

Project Director

Changed

Final

Interim, Final

Interim, Final
An information button was added to provide onscreen guidance for various functions and specific
reporting requirements.

Interim, Final

Add an Overseas Program Request Project Director

None

Fellow Administration

Project Director

None

Add / Update a Fellow

Project Directors

Changed

Fellow Type

Instructor Administration

Project Director

New

Add an Instructor

As needed

Add an Instructor

Project Director

New

Instructor name
Email
Instructor Fellows

As needed

Travel Approval Request (TAR)

Project Director

None

Add a TAR

Project Director

None

New question: "Required for Student selection: Did
the Program Officer approve the student's Overseas
Program Request? Yes / No

Selection Processes /
Competition Description

Project Director

Changed

Undergraduates applicants
Graduate applicants
Ph.D. applicants
Number of FLAS Awards
Number of Alternates
Selection Processes

Selection Processes Addendum

Project Director

Removed

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

Interim, Final

Create/Edit Fellow

Project Director

Removed

View / Submit Report

Project Director

None

Proposed Changed to Current IRIS System

Interim, Final
Interim, Final
Fellow Type dropdown
containing Undergraduate;
Master's; Master's / PhD;
Doctorate

As needed

As needed
As needed

Interim, Final

Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim
Interim, Final

13

Program
Instructors use the following screens to enter language evaluation data.
FLAS
Instructor

FLAS
Student
Tracking

Screen

User Type

Changes

New Instructions / Fields

Instructor Evaluation

Project Director

New

New page containing a link to the evaluation.

Enter Instructor Evaluation

Project Director

New

New page containing a survey based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking and Listening
proficiency.

Removed Fields

Dropdown Changes

Report Type

Removed Fields

Dropdown Changes

Report Type

Project directors use the following screens to report student tracking data every two years, for an eight year period.

Screen

User Type

Changes

New Instructions / Fields

Student Tracking

Project Director

New

New page consisting of data collection fields for the
project directors to complete every two years.

Student Tracking Fields

Project Director

New

FRA Fellow
This program provides grants to institutions of higher education to fund faculty to maintain and improve their area studies and language skills by conducting research abroad for periods of 3 to 12 months.

Fellows use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Fellow

None

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

Fellow Information

Fellow

None

Interim

Abstract

Fellow

None

Interim

Pre-Fellowship Foreign Language
Self-Evaluation
Enter Pre Self-Evaluation

Fellow

None

Interim

Awarded Budget
View / Submit Report

Changed

A completely new survey replaced the previous selfevaluation. The new survey is based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking, Reading, and Listening
proficiency.

Interim

Fellow

Changed

"Other Funds" column was added.

Interim

Fellow

None

Interim

Research Results

Fellow

None

Final

Dissemination of Information

Fellow

None

Final

Proposed Changed to Current IRIS System

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

14

Program

FRA Fellow Publications and Research

Fellow

Changed

Adjustments to Project

Fellow

None

Project Support

Fellow

Changed

An information button was added to provide onscreen guidance for various functions and specific
reporting requirements.

Final

Advice for Future Fellows

Fellow

Removed

Replaced by "Feedback"

Final

Feedback

Fellow

New

Check box with the following text was added to the
former "Advice for Future Fellows" screen: "This
feedback will be shared with future fellows unless
you check here."

Final

Presentations

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

Final

Final

Post-Fellowship Foreign Language Fellow
Self-Evaluation
Enter Post Self-Evaluation
Fellow

None

Final

Changed

A completely new survey replaced the previous selfevaluation. The new survey is based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking, Reading, and Listening
proficiency.

Final

Actual Budget

Fellow

Changed

"DDRA Funds Awarded" column was added.

Final

View / Submit Report

Fellow

None

Final

Project directors use the following screens to report grant activity for a reporting period.

FRA
Director

Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

None

Add a User

Project Director

New

User name, Email, and Title

Fellow Administration

Project Director

Changed

"Hiatus Request" column and "Create / Update"
button was added.

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type

As needed
As needed
"Add a Fellow" button was
removed;

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

As needed

15

Program

FRA
Director

GPA
Annual

Update Fellow Information

Project Director

Changed

Research dates are now editable;
Time Extension button

Final

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Final

Hiatus Request

Project Director

New

Fellow's Hiatus Travel Itinerary
Does the fellow have the appropriate insurance?
Does the fellow have the appropriate visas?
New end date of research period:

As needed

Grant Activation Request (GAR)

Project Director

Changed

Information buttons were added to provide onscreen guidance for various functions and specific
reporting requirements.

As needed

Priorities

Project Director

Removed

Final

View / Submit Report

Project Director

None

Final

The Fulbright-Hays -- Group Projects Abroad (GPA) Program provides grants to support overseas projects in training, research, and curriculum development in modern foreign languages and area studies
by teachers, students, and faculty engaged in a common endeavor. Projects may include short-term seminars, curriculum development, group research or study, or advanced intensive language programs.
The annual grants to institutions are for a single trip and do not focus on language.

Participants use the following screens to report project activity for a reporting period.
Screen

User Type

Changes

Participant

None

Final

Participant

None

As needed

Orientation Evaluation

Participant

Changed

Questions 1 and 2 were combined and a new #1
was created. The following was added as #8:
"Understanding / explanation of what is expected
from participants as an outcome." A check box was
added along with "This will be shared with your PD
anonymously unless you check here."

Final

In-country Experience Evaluation

Participant

Changed

A check box was added along with "This will be
shared with your PD anonymously unless you check
here."

Final

Outreach Activities

Participant

Changed

"Web site"

Final

Welcome
GPA
Participant Update Password
Annual

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type

16

Program
Publications and Research
GPA
Participant Presentations
Annual

View / Submit Report

Participant

Changed

Project Director

None

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

N/A

Final

Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Director

None

Project Information

Project Director

Changed

Country(ies) of Study
of weeks abroad?
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
permission to edit reports for this project, click the
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

As needed

Add a User

Project Director

New

User name, Email, and Title

As needed

Travel Approval Request

Project Director

None

As needed

Add a TAR

Project Director

None

As needed

Participant Administration
(Maintain Participants)
Add / Update Participant

Project Director

Combined Report Reminder button added

Project Director

Changed

Participant / Administrator type

Project Overview

Project Director

Changed

Check box and "I certify that the U.S. Embassy and
Fulbright-Hays Commission (if applicable) in host
country of study have been notified and provided
with detailed project info."

Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

17

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

Number

Entered when grant
is set up in system
Final

Interim
Position title

Interim

Program
Pre-Departure Preparation and
GPA
Participant Orientation Evaluation
Annual In-Country Activities

Project Director

None

Final

Project Director

None

Final

In-Country Experience Evaluation

Project Director

None

Final

Sources of Funding

Project Director

None

Final

Outreach Activities

Project Director

None

Add an Outreach Activity

Project Director

None

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

Is this a planned or completed activity?

Final
Final
NCC, Final

Final

The Fulbright-Hays -- Group Projects Abroad (GPA) Program provides grants to support overseas projects in training, research, and curriculum development in modern foreign languages and area studies
GPA
Language by teachers, students, and faculty engaged in a common endeavor. Projects may include short-term seminars, curriculum development, group research or study, or advanced intensive language programs.
The language grants to institutions are three years in length, for a total of three trips. These programs focus on language.

Participants use the following screens to report project activity for a reporting period.
Screen

User Type

Changes

Participant

None

Education

Participant

Removed

Orientation Evaluation

Participant

Changed

Update Password
GPA
Participant
Language

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

Final

Questions 1 and 2 were combined and a new #1
was created. The following was added as #8:
"Understanding / explanation of what is expected
from participants as an outcome." A check box was
added along with "This will be shared with your PD
anonymously unless you check here."

Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

18

Program
In-country Experience Evaluation
GPA
Participant
Language

GPA
Director
Language

Participant

Changed

A check box was added along with "This will be
shared with your PD anonymously unless you check
here."

Final

Publications and Research
Presentations

Participant

Changed

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

N/A

Foreign Lang Self-Evaluation

Participant

Changed

A completely new survey replaced the previous selfevaluation. The new survey is based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking, Reading, and Listening
proficiency.

Oral Proficiency Scores were
transferred to the "Add / Update
Participant" screen of the GPA
Language Project Director
report.

Screen

User Type

Changes

New Instructions / Fields

Removed Fields

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
permission to edit reports for this project, click the
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

As needed

Add a User

Project Director

New

User name, Email, and Title

As needed

Travel Approval Request

Project Director

None

Add a TAR

Project Director

None

Proposed Changed to Current IRIS System

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Final

Dropdown Changes

Report Type

As needed

19

Program
Report Schedule
GPA
Director
Language

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Request

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Participant Administration
(Maintain Participants)
Add / Update Participant

Project Director

Combined Report Reminder button added

Project Director

Changed

Project Overview

Project Director

None

Status/Impact

Project Director

Removed

Pre-Departure Preparation and
Orientation Evaluation
In-Country Activities

Project Director

None

Interim

Project Director

None

Interim

In-Country Experience Evaluation

Project Director

None

Interim

Sources of Funding

Project Director

None

Objectives and Accomplishments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Adjustments to Project

Project Director

New

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

New

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Evaluation
GPA
Director
Language

Proposed Changed to Current IRIS System

Oral Proficiency Scores
Time Frame of Training
City & Country of Study
Language(s) of Study

Interim
As needed

Interim
NCC, Interim, Final

Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

20

Program
Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

Instructors use the following screens to ender language evaluation data.
GPA
Language
Instructor

IIPP

Screen

User Type

Changes

New Instructions / Fields

Instructor Evaluation

Project Director

New

New page containing a link to the evaluation.

Enter Instructor Evaluation

Project Director

New

New page containing a survey based on the
Interagency Language Roundtable's (ILR) SelfAssessments on Speaking and Listening
proficiency.

Removed Fields

Dropdown Changes

Report Type

This program provides a single grant to assist a consortium of colleges and universities to establish an institute designed to increase the representation of minorities in international service, including private
international voluntary organizations and the foreign service of the United States.

Project directors use the following screens to report grant activity for a reporting period.

IIPP

Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Director

New

User name, Email, and Title

Travel Approval Request (TAR)

Project Director

None

As needed

Add a TAR

Project Director

None

As needed

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type

As needed

Dropdown added for Title.

As needed

21

Program

IIPP

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Status/Impact

Project Director

Removed

Replaced by "Objectives and Accomplishments".

NCC, Interim, Final

Objectives and Accomplishments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

Fellows Tracking

Project Director

None

Proposed Changed to Current IRIS System

NCC, Interim, Final

Final

NCC (first only)

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

NCC, Final
Interim, Final

22

Program

IIPP

Add a Fellow

Project Director

None

Institutional Partnership Activities

Project Director

Changed

Title changed to "Institutional Partnership Activities"

Add an Institutional Partnership

Project Director

Changed

"Matching funds amount" with data field was added
below "Title VI IIPP funds amount:".

Development of Instructional
Resources

Project Director

None

Add an Instructional Resource

Project Director

Changed

Faculty Enhancement

Project Director

None

Enhancement of Faculty Expertise

Project Director

Changed

Interim, Final

Deleted questions: "At this
institution in the current
program year, how many
students graduated with IAS or
foreign language majors? How
many faculty members taught
IAS or foreign languages?

Interim, Final

Interim, Final
Web site:; data fields for Title VI IIPP funds amount, Title VI IIPP and matching
and Matching funds amount.
funds sub-grant amount:

Interim, Final

Interim, Final
Data fields for Title VI IIPP funds amount, and
Matching funds amount.

Title VI IIPP and matching
funds sub-grant amount:

Interim, Final

Language and International and
Project Director
Area Studies Programs
Language and International and
Project Director
Area Studies Programs Created or
Enhanced

None

Language and International and
Area Studies Courses
Language and International and
Area Studies Courses Created or
Enhanced

Project Director

None

Interim, Final

Project Director

None

Interim, Final

Removed

Interim, Final

None

Interim, Final

Participation in International Travel Project Director
from the U.S.
View / Submit Report
Project Director

IIPP
Student
Tracking

Interim, Final

Changed

Interim, Final
Web site:; data fields for Title VI IIPP funds amount, Title VI IIPP and matching
and Matching funds amount.
funds sub-grant amount:

Interim, Final

Project directors use the following screens to report student tracking data every two years, for an eight year period.

Screen

User Type

Changes

New Instructions / Fields

Student Tracking

Project Director

New

New page consisting of data collection fields for the
project director to complete every two years.

Student Tracking Fields

Project Director

New

New page consisting of data collection fields for the
project director to complete every two years.

Proposed Changed to Current IRIS System

Removed Fields

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type

23

Program

IRS

This program supports surveys, studies, and instructional materials development to improve and strengthen instruction in modern foreign languages, area studies, and other international fields to provide
full understanding of the places in which the foreign languages are commonly used.

Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

New

User name, Email, and Title

Add a User
Travel Approval Request (TAR)

Project Director

Add a TAR

IRS

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type

As needed

Dropdown added for Title.

As needed
As needed

None

As needed

None

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Status/Impact

Project Director

Removed

Replaced by "Objectives and Accomplishments".

NCC, Interim, Final

Objectives and Accomplishments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

24

Proposed Changed to Current IRIS System

NCC, Interim, Final

Final

NCC (first only)

Program

IRS

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

Projects Conducted

Project Director

None

Add a Project

Project Director

Changed

Adoption of Outcomes

Project Director

None

Proposed Changed to Current IRIS System

Interim, Final
Type of Assessment

Assessment Instrument

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim, Final
Interim, Final

25

Program

LRC

Publications and Research
Presentations

Project Director

Changed

Outreach Activity

Project Director

None

Add an Outreach Activity

Project Director

Changed

Outreach Defaults

Project Director

None

Sources of Funding

Project Director

Changed

View / Submit Report

Project Director

None

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

Interim, Final

Interim, Final
World Area of Focus; Partnerships:

Partner: and comment field
World Area of Focus
replaced by "Partnerships:" and dropdown added;
a dropdown.
Partnerships dropdown
added.

Interim, Final

Interim, Final
Sub-categories for Research
Projects and Materials
Development were removed.

Interim, Final

Interim, Final

This program provides grants for establishing, strengthening, and operating centers that serve as resources for improving the nation's capacity for teaching and learning foreign languages through teacher
training, research, materials development, and dissemination projects.

Project directors use the following screens to report grant activity for a reporting period.

LRC

Screen

User Type

Changes

Update Password

Project Director

None

Project Information

Project Director

Changed

"World Area" dropdown added after Countries.

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Entered when grant
is set up in system
As needed

26

Program

IRS

Add a User

Project Director

New

Travel Approval Request (TAR)

Project Director

None

Add a TAR

Project Director

None

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Status/Impact

Project Director

Removed

Replaced by "Objectives and Accomplishments".

NCC, Interim, Final

Objectives and Accomplishments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Proposed Changed to Current IRIS System

User name, Email, and Title

Dropdown added for Title.

As needed
As needed
As needed
NCC, Interim, Final

Final

NCC (first only)

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

27

Program

NRC

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

Projects Conducted

Project Director

None

Add a Project

Project Director

Changed

Adoption of Outcomes

Project Director

None

Publications and Research
Presentations

Project Director

Changed

Outreach Activity

Project Director

None

Add an Outreach Activity

Project Director

Changed

Outreach Defaults

Project Director

None

Sources of Funding

Project Director

Changed

View / Submit Report

Project Director

None

Interim, Final
Type of Assessment

Assessment Instrument

Interim, Final
Interim, Final

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) funds."
The previous categories were replaced with: Audio,
video, and podcasts:; Authored books:; Assessment
materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields).

Interim, Final

Interim, Final
World Area of Focus; Partnerships:

Partner: and comment field
World Area of Focus
replaced by "Partnerships:" and dropdown added;
a dropdown.
Partnerships dropdown

Interim, Final

Sub-categories for Research
Projects and Materials
Development were removed.

Interim, Final

Interim, Final

Interim, Final

This program provides grants to institutions of higher education or consortia of institutions of higher education to establish, strengthen, and operate comprehensive and undergraduate language and
area/international studies centers that will be national resources for: teaching of any modern foreign language; instruction in fields needed to provide full understanding of areas, regions, or countries in
which the language is commonly used; research and training in international studies; language aspects of professional and other fields of study; and, instruction and research on issue in world affairs.
·

Project directors use the following screens to report grant activity for a reporting period.
Screen

Proposed Changed to Current IRIS System

User Type

Changes

New Instructions / Fields

Removed Fields

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Dropdown Changes

Report Type

28

Program

NRC

Update Password

Project Director

None

Project Information

Project Director

Changed

"Center Thematic Focus" was added below the
Countries dropdown section.

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Director

New

User name, Email, and Title

Travel Approval Request (TAR)

Project Director

None

Add a TAR

Project Director

None

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Status/Impact

Project Director

Removed

Replaced by Objectives and Assessments.

NCC, Interim, Final

Objectives and Assessments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

29

Proposed Changed to Current IRIS System

As needed
"Center Thematic Focus"
dropdown containing Arts
and Culture; Business;
Economic Development;
Education; Environment;
Journalism; Media Studies;
Public Health; Religion;
Comparative Politics;
Regional Politics; Global
Studies; Other.

Entered when grant
is set up in system

As needed

Dropdown added for Title.

As needed
As needed
As needed
As needed

Final

NCC (first only)

Program
Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

Development of Instructional
Resources
Add an Instructional Resource

Project Director

None

Interim, Final

Project Director

None

Interim, Final

Program Graduates - Bachelor's
Degrees

Project Director

None

Interim, Final

Program Graduates - Master's
Degrees

Project Director

None

Interim, Final

Program Graduates - Doctoral
Degrees

Project Director

None

Interim, Final

Graduate Placements

Project Director

None

Interim, Final

Outreach Activity

Project Director

None

Interim, Final

Proposed Changed to Current IRIS System

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim, Final

30

Program

NRC

Add an Outreach Activity

Project Director

Changed

Outreach Defaults

Project Director

None

Resource Leveraging

Project Director

Changed

Language Courses

Project Director

None

Interim, Final

Add a Language Course

Project Director

None

Interim, Final

International and Area Studies
Courses
Add an International and Area
Studies Course

Project Director

None

Interim, Final

Project Director

None

Interim, Final

Proposed Changed to Current IRIS System

Theme / topic with text field; Primary Activities with
dropdown; Activity Outcomes with text field.

Primary Activities dropdown
containing Conference;
Cultural event; Curriculum
development; Exhibit;
Lecture; Lecture series /
Brown bag; Panel
discussion; Performance;
Presentation; Seminar;
Symposium; Teacher
training - area studies;
Teacher training - language;
Media briefing; Business
briefing.

Interim, Final

Interim, Final
Instructional text changed to "Indicate any additional
funds provided by your institution or another entity
to support NRC activities and objectives for the
current reporting period. In the first column, enter
the amount of NRC grant funds used. In the
remaining columns, enter the funds that each entity
provided to support the activity. If an activity or
funding source is not applicable, enter the number 0
(zero). Columns expanded to include "Foundation"
and "State or Local Government". The activity
categories have been replaced by the following:
"Conference, Lecture Series, or Seminar;
Evaluation; Language Assessment; Commonly
Taught Language Instruction; Less Commonly
Taught Language Instruction(French, German,
Spanish); Non-Language Instruction; Library and
Information Resources; Outreach; Overseas
Linkages; Staff Development; Total"

Sub-categories under
"Commonly Taught Language
Instruction:" Chinese; Italian;
Japanese; Russian

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim, Final

31

Program

NRC

SA

Publications and Research
Presentations

Project Director

Changed

View / Submit Report

Project Director

None

Instructional text changed to "Indicate the total
number of publications and presentations
conducted, developed, and /or written during the
current reporting period with (program name) grant
funds." The previous categories were replaced with:
Audio, video, and podcasts:; Authored books:;
Assessment materials: Book chapters:; Conference
papers/presentations:; Curricula and textbooks:;
Edited books:; Journal articles:;
Reports/monographs:; Teaching cases:; Toolkits
and instructional materials:; Working papers:; Other:
(with three data fields). "Related federal grants
section added with a table consisting of the following
categories: Type of grant; Funding agency; Activity
(from list above); Amount. The following
instructional text was added to this section: "If this
course has more related federal grant(s), enter the
total number and click "Display Rows."

Interim, Final

Interim, Final

The program provides short-term study and travel seminars abroad for U.S. educators in the social sciences and humanities for the purpose of improving their understanding and knowledge of the peoples
and cultures of other countries. Support is generally made available through interagency agreements. The Department of Education transfers funds through the State Department to Fulbright commissions
in various countries to pay the costs associated with administering seminars. This partnership allows the program to use the services and expertise of binational organizations to plan and conduct seminars
for U.S. educators. There are approximately seven to ten seminars with fourteen to sixteen participants in each seminar annually. Seminars are four to six weeks in duration. All seminars are held in
countries outside of Western Europe.

Participants use the following screens to report project activity for a reporting period.
Screen

User Type

Changes

Participant

None

Welcome

Participant

None

Professional Experience

Participant

Changed

Orientation Evaluation

Participant

None

Interim

In-Country Experience Evaluation

Participant

None

Final

Update Password
SA
Participant

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

Interim
Two new questions: "How many years have you
been in that position?" and "How many years have
you been an educational professional?"

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim

32

Program
Add In-Country Experience
SA
Participant Evaluation

Participant

None

Final

Language Proficiency and
Knowledge

Participant

None

Final

Foreign Language Self-Evaluation
(only for Japanese seminar)

Participant

Removed

Final

Curriculum Project

Participant

Changed

Outreach Activities

Participant

None

Final

Add an Outreach Activities

Participant

None

Final

View / Submit Report

Participant

None

Final

Discussions

Final

Administering agencies use the following screens to report grant activity for a reporting period.
Screen

SA Admin Update Password
Agency
Welcome
Project Information

Additional Users
Add a User
Awarded Budget
Expended Budget
Pre-Departure Preparation and
Orientation Evaluation
Itinerary

In-Country Experience Evaluation
View / Submit Report
View Participant Report

Proposed Changed to Current IRIS System

User Type

Changes

Administering
Agency

None

As needed

Administering
Agency
Administering
Agency

None

Final

None

Entered when grant
is set up in system

Administering
Agency
Administering
Agency
Administering
Agency
Administering
Agency
Administering
Agency
Administering
Agency

None

As needed

New

As needed

Administering
Agency
Administering
Agency
Administering
Agency

None

Final

None

Final

None

Final

Changed
Changed

New Instructions / Fields

Removed Fields

Title changed to "Administering Agency Awarded
Budget".
Title changed to "Administering Agency Expended
Budget".

Report Type

Prior to seminar
Final
Final

None
Changed

Dropdown Changes

Upload fields added for Pre-Departure Orientation,
International Travel, and Seminars Agenda

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Final

33

Program

SA Admin View Domestic Institution Report
Agency

Administering
Agency

Final

None

Domestic institutions use the following screens to report grant activity for a reporting period.

SA
Domestic

TICFIA

Screen

User Type

Changes

Update Password

Domestic
Institution

None

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

Welcome

Domestic
Institution

None

Final

Domestic Institution Projected
Budget

Domestic
Institution

Changed

New/ revised categories: Domestic Air Travel; Local Removed categories:
Travel (taxi, shuttle, bus, etc); Participant Per Diem; International Air Travel; InterEscort(s).
Country and Inter-City Travel;
Visas; Interpreters; PreDeparture Orientation; InCountry Orientation

Entered when grant
is set up in system

Domestic Institution Actual Budget

Domestic
Institution

Changed

Final

Pre-Departure Preparation and
Orientation Evaluation

Domestic
Institution

None

New/ revised categories: Domestic Air Travel; Local Removed categories:
Travel (taxi, shuttle, bus, etc); Participant Per Diem; International Air Travel; InterEscort(s).
Country and Inter-City Travel;
Visas; Interpreters; Pre-

View / Submit Report

Domestic
Institution

None

Final
Final

The Technological Innovation and Cooperation for Foreign Information Access (TICFIA) Program supports projects that will develop innovative techniques or programs using new electronic technologies to
collect information from foreign sources. Grants will be made to access, collect, organize, preserve, and widely disseminate information on world regions and countries other than the United States that
address our nation's teaching and research needs in international education and foreign languages.

Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Director

None

Project Information

Project Director

Changed

Proposed Changed to Current IRIS System

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type
As needed

Primary world area
Additional world areas

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Entered when grant
is set up in system

34

Program

TICFIA

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Director

New

User name, Email, and Title

Travel Approval Request (TAR)

Project Director

None

Add a TAR

Project Director

None

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Status/Impact

Project Director

Removed

Replaced by "Objectives and Accomplishments".

NCC, Interim, Final

Objectives and Accomplishments

Project Director

New

"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

NCC, Interim, Final

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

35

Proposed Changed to Current IRIS System

As needed

Dropdown added for Title.

As needed
As needed
As needed
NCC, Interim, Final

Final

NCC (first only)

Program

TICFIA

Exemplary Activities

Project Director

Changed

Use of Technology

Project Director

None

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

Partners/Collaborators

Project Director

None

Interim, Final

Foreign Resources Collected
and/or Transferred to Electronic
Form

Project Director

None

Interim, Final

Dissemination of Resources to
Target Audiences
View / Submit Report

Project Director

None

Interim, Final

Project Director

None

Interim, Final

Proposed Changed to Current IRIS System

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

NCC, Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

36

Program

UISFL

This program provides funds to institutions of higher education, a combination of such institutions, or partnerships between nonprofit educational organizations and institutions of higher education to plan,
develop, and carry out programs to strengthen and improve undergraduate instruction in international studies and foreign languages.

Project directors use the following screens to report grant activity for a reporting period.
Screen

User Type

Changes

Update Password

Project Director

None

As needed

Project Information

Project Director

None

Entered when grant
is set up in system

Additional Users

Project Director

Changed

New instructions: "To add an additional user with
Text fields for first and last
permission to edit reports for this project, click the
name, email address, and title.
add a user button. The system will email login
information to each added user. The user will have
access to all functionalities in IRIS except report
submission which is restricted to the Project
Director. If a user is no longer associated with the
project, the Project Director must remove that user
from IRIS. IEPS staff may not add or delete users
from IRIS."

Add a User

Project Director

New

User name, Email, and Title

Travel Approval Request (TAR)

Project Director

None

Add a TAR

New Instructions / Fields

Removed Fields

Dropdown Changes

Report Type

As needed

Dropdown added for Title.

As needed
As needed
As needed

None

Report Schedule

Project Director

Changed

Fiscal Year column added between Report Type
and Due Date;
Time Extension button

Time Extension Notification

Project Director

New

A new form has been added permitting project
directors to notify IEPS program staff when
additional time is needed to complete the final
report.

Abstract

Project Director

Removed

Objectives and Accomplishments

Project Director

New

Objectives

Project Director

Combined Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Accomplishments

Project Director

Combined Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Proposed Changed to Current IRIS System

NCC, Interim, Final

Final

NCC (first only)
"Describe each of the objectives of the project and
the progress made towards those objectives during
the current reporting period."

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

NCC, Interim, Final

37

Program

UISFL

Adjustments to Project

Project Director

Changed

Instructional text changed to "For any planned
activity that was scheduled to take place during the
current reporting period but did not, explain the
circumstances.
Indicate whether you still plan to conduct the activity
and when; or, specify the amount of funds to be
reprogrammed, the activities to
be conducted, and when."

NCC, Interim, Final

Exemplary Activities

Project Director

Changed

Instructional text changed to "Describe project
activities that showcase the grantee's success in
meeting its project objectives in a particularly
effective way during
the current reporting period and that you would
recommend for replication or dissemination because
of their content and impact."

NCC, Interim, Final

Director's Assessment

Project Director

Removed

Replaced by "Objectives and Accomplishments"

NCC, Interim, Final

Next Project Year

Project Director

Removed

Replaced by "Evaluation"

Evaluation

Project Director

New

"Describe project-related evaluation activities that
have taken place during the current reporting
period." Two upload fields with the following text
were added below the comment section: "Please
upload any evaluation or assessment reports
regarding your grant activities."

NCC, Interim, Final

Priorities

Project Director

Changed

Instructional text changed to "Describe any activities
that took place during the current reporting period
which address the announced priorities of the
program.
Indicate if grant funds were used to support the
activities. To view a list of the announced priorities,
click here."

NCC, Interim, Final

Budget

Project Director

Changed

Budget categories were modified to accommodate
carry over funds.

NCC, Interim, Final

Faculty Enhancement

Project Director

None

Interim, Final

Enhancement of Faculty Expertise

Project Director

None

Interim, Final

Language Programs Created or
Enhanced
Add a Language Program

Project Director

None

Interim, Final

Project Director

Changed

Language Courses Created or
Enhanced
Add a Language Course

Project Director

None

Project Director

Changed

Proposed Changed to Current IRIS System

Web site:; data fields for UISFL funds amount, and
Matching funds amount.

NCC, Interim

Interim, Final
Interim, Final

Data fields for UISFL funds amount, and Matching
funds amount.

Interim, Final

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

38

Program

UISFL

Language Faculty/Instructor
Positions

Project Director

Interim, Final

None

Add a Language Faculty / Instructor Project Director
Position

Changed

International and Area Studies
(IAS) Programs Created or
Enhanced

Project Director

None

Add an IAS Program

Project Director

Changed

International and Area Studies
Courses Created or Enhanced

Project Director

None

Add an IAS Course

Project Director

Changed

International and Area Studies
Faculty/Instructor Positions

Project Director

None

Add an IAS Faculty / Instructor
Position

Project Director

Changed

Outreach Activity

Project Director

None

Add an Outreach Activity

Project Director

Changed

Outreach Defaults

Project Director

None

Interim, Final

Study Abroad and Internship
Programs Created or Enhanced
Add a Study Abroad or Internship
Program
View / Submit Report

Project Director

None

Interim, Final

Project Director

Changed

Project Director

None

Proposed Changed to Current IRIS System

Data fields for UISFL funds amount, and Matching
funds amount.

Interim, Final

Interim, Final

Data fields for UISFL funds amount, and Matching
funds amount.

Interim, Final
Interim, Final

Data fields for UISFL funds amount, and Matching
funds amount.

Interim, Final
Interim, Final

Data fields for UISFL funds amount, and Matching
funds amount.

Interim, Final
Interim, Final

Data fields for UISFL funds amount, and Matching
funds amount;

Field for Funds to support students in program.

U.S. Department of Education, OPE, International Education Programs Service (IEPS)

Interim, Final

Interim, Final
Interim, Final

39


File Typeapplication/pdf
File Modified2009-10-05
File Created2009-10-05

© 2024 OMB.report | Privacy Policy