The burden and
cost assumptions and calculations for the respondents and the
agency should be updated in the next renewal.
Inventory as of this Action
Requested
Previously Approved
07/31/2010
36 Months From Approved
07/31/2007
29
0
29
4,914
0
4,914
131,600
0
132,000
Owners or operators of all affected
facilities subject to NSPS must submit initial notifications,
performance tests results, and periodic reports. Owners or
operators are also required to maintain records of the occurrence
and duration of any startup, shutdown, or malfunction in the
operation of an affected facility, or any period during which the
monitoring system is inoperative. These notifications, reports, and
records are essential and enable the Agency to: (1) identify the
sources subject to the standard; (2) ensure initial compliance with
emission limits; and (3) verify continuous compliance with the
standard.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.