NSPS for Secondary Brass and Bronze Production, Primary Copper Smelters, Primary Zinc Smelters, Primary Lead Smelters, Primary Aluminum Reduction Plants and Ferroalloy Production Facilities...
ICR 200402-2060-004
OMB: 2060-0110
Federal Form Document
⚠️ Notice: This information collection may be outdated. More recent filings for OMB 2060-0110 can be found here:
NSPS for Secondary Brass and
Bronze Production, Primary Copper Smelters, Primary Zinc Smelters,
Primary Lead Smelters, Primary Aluminum Reduction Plants and
Ferroalloy Production Facilities...
Extension without change of a currently approved collection
Owners or operators of all affected
facilities subject to NSPS must submit initial notifications,
performance tests results, and periodic reports. Owners or
operators are also required to main- tain records of the occurrence
and duration of any startup, shut- down, or malfunction in the
operation of an affected facility, or any period during which the
monitoring system is inoperative. These notifications, reports, and
records are essential and en- able the Agency to: (1) identify the
sources subject to the stadard; (2) ensure initial compliance with
emission limits; and (3) verify continuous compliance with the
standard.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.