RUS Form 254 Construction Inventory

7 CFR 1726, Electric System Construction Policies and Procedures- Electric

Form RUS 254

7 CFR 1726, Electric System Construction Policies and Procedures- Electric

OMB: 0572-0107

Document [docx]
Download: docx | pdf

According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-0107, which expires on XXXX. The time required to complete this information collection is estimated to average 2 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection information. All responses to this collection of information are voluntary. Any questions on this burden can be sent to ICRMTRequests@usda.gov



U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE



CONSTRUCTION INVENTORY

(FOR LABOR AND MATERIAL CONTRACT)

SHEET

OF

SHEETS


DATE

PROJECT DESIGNATION

CONTRACT NO.

BORROWER

RUS PROJECT CODE(S)

ENGINEER

CONTRACTOR

AMOUNT PAYABLE TO CONTRACTOR

  1. TOTAL COST OF STANDARD, NEW AND CONVERSION ASSEMBLY UNITS INSTALLED

(Total Column 6 RUS Form 254a)


  1. COST TO REMOVE ''I'' UNITS (Total Column 7, RUS Form 254a)


  1. AMOUNT TO BE CREDITED TO CONTRACTOR FOR MATERIALS REMOVED FROM

EXISTING FACILITIES AND RETURNED (Total Column 14, RUS Form 254b)


SUBTOTAL


DEDUCT:

  1. AMOUNT CHARGEABLE TO CONTRACTOR FOR MATERIALS IN ASSEMBLY UNITS

REMOVED (Total Column 9, RUS Form 254a)

  1. NET AMOUNT OF OWNER-FURNISHED MATERIALS (Total Column 24, RUS Form 254c)

Shape5


  1. NET AMOUNT DUE CONTRACTOR

(In making final payment to Contractor, the net amount due the Contractor, as shown by this Certification, will be reduced by the sums, if any, due the Owner for liquidated damages, payment made to date, or other sums which the owner has the right to retain under the terms of the Contract, and signature by all parties does not preclude the retention by the Owner of such amounts.)


CERTIFICATE OF ENGINEER

I certify that to the best of my knowledge and belief the attached final inventory correctly shows the total number and character of assembly units installed and removed by the Contractor and that the net amount of

due the Contractor, as shown above, is true and correct.


Shape6



Shape7

ENGINEER

By

Shape9

DATE


ACCEPTANCE BY OWNER


Shape10

OWNER


By

Shape11

DATE PRESIDENT


ACCEPTANCE BY CONTRACTOR


FIRM

By

DATE

RUS FORM 254 (Rev. 2-04)







-- --

RUS Form 254 Instructions

(See RUS Bulletin 176713-3, Preparation and Use of RUS Form 254, for additional instructions)


The Engineer will prepare 5 copies of RUS Form 254 and 254a; also 5 copies of Forms 254b and 254c when applicable,


Calculation of amount payable to Contractor will employ data taken from Nos. 1 thru 25, RUS Forms 254, 254a, 254b, and 254c. The amounts to be inserted opposite Items A, B, C, D, and E on RUS Form 254 are indicated in the texts of those items.

Data shown on Form 254c to be presented under the following headings, as appropriate:


Shape17 PART 1. MATERIAL ITEMS INCLUDED IN LISTS SET

FORTH IN CONSTRUCTION CONTRACT.



PART 11. OTHER MATERIAL ITEMS FURNISHED BY

OWNER.


Nos. 1 thru 17, Forms 254a & 2541b: (Form 254b

is required only when ''I'' removal units are included in the

Contract.)

Nos. 18 through 25: (Form 254c is required only when

there are owner-furnished materials.)



No. Source of Information No. Source of Information


Shape18 1 and 2 From tabulation of staking sheets *


18 and 19


From Contract and Material Receipts

3 and 4 From Contract

  1. No. 3 plus No. 4

  1. From charge-out and credit tickets covering materials issued to and returned by Contractor **

  1. No. 1 multiplied by No. 5

  2. No. 1 multiplied by No. 3

(for ''I'' units only).

From average unit costs on charge-out and credit tickets relating to this construction, such costs in turn being taken from the average unit

  1. Shape19 From Table ''C'' of Contract

  2. No. 1 multiplied by No. 8

for ''I'' removal units only. (Table

C relates solely to "I" units.)

costs reflected by the stock record cards for

the applicable period.

  1. No. 20 multiplied by No. 21

  2. For Part 1, from the unit prices specified in the

1 0, 1 1, & 12 ... From Engineer's and Owner's records

Contract in the ''List of Owner Furnished

  1. From Table D in Contract

  2. No. 12 multiplied by No. 13

  3. From Engineer's records

(Quantities shall be listed opposite the appropriate material items described in No. 1 1.)

  1. From individual stock record card

for each material item listed.

  1. No. 15 multiplied by No. 16

Materials''

For Part 11, from the actual unit costs to Owner--

the same as used in No. 21

  1. No. 20 multiplied by No. 23

  2. No. 24 minus No. 22. (if a minus

quantity, enter in parentheses.)



See 7 CFR 1726, Electric System Construction Policies and Procedures, for instructions regarding distribution of the

completed forms.



Reference should be made to RUS Bulletin 1767B-3, Preparation and Use of the RUS Form 254, for instruction in accounting for all contract costs, including the retirement of units removed by the Contractor and the unitization by record units of costs of construction assemblies installed by the Contractor.

Shape20

* Standard units will be listed first, followed by new units and conversion units, in that order, with all "I" removal units being listed

last. In Column 2, under ''Unit No.'', enter the unit identifier, and under ''Type'', enter either: "N-New", "H-Conversion" or "I-Removal".

** The quantities shown in No. 20 should agree with materials receipts prepared in connection with the contract.

The types of items of material and the quantity of any item of material listed under Part I of the tabulation should be limited to the type of items and should not exceed the quantity of any item of material specified in the construction contract in the ''List of Owner Furnished Materials.'' Any additional items of material or excess quantities over the items specified in such lists are to be shown under Part 11 of the tabulation.




RUS FORM 254 Instructions (Rev. 2-04)












U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE

CONSTRUCTION INVENTORY

(FOR LABOR AND MATERIAL CONTRACT)

SHEET OF SHEETS

DATE

PROJECT DESIGNATION

CONTRACT NO.

BORROWER

ENGINEER

CONTRACTOR

ASSEMBLY UNITS

DUE CONTRACTOR FOR UNITS INSTALLED, CONVERTED AND REMOVED

AMOUNT CHARGEABLE TO

CONTRACTOR FOR MATERIALS IN ASSEMBLIES REMOVED

QUAN- TITY

UNIT NO. / TYPE

N-New

H-Conversion I--Removal

LABOR UNIT PRICE

EXCEPT I UNITS

COST TO REMOVE ''I''

UNITS

(Col.1 x Col.3)

MATERIAL UNIT PRICE

TOTAL UNIT PRICE

(Col.3 + Col.4)

COST OF CONSTRUCTION

(Col.1 x Col.5)

UNIT VALUE

(Table C)

TOTAL

(Col.1 x Col.8)

1

2

3

4

5

6

7

8

9



/









/


/










/









/


/









/


/










/









/


/










/









/


/










/









/


/










/









/


/










/









/


/










/









/


/









/









/


/









/


/










/


/










/


/










/


/










/


/









/

/










/


/









TOTAL








RUS FORM 254a (Rev. 2-04)






U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE

CONSTRUCTION INVENTORY

(FOR LABOR AND MATERIAL CONTRACT)

SHEET OF SHEETS

DATE

PROJECT DESIGNATION

CONTRACT NO.

BORROWER

ENGINEER

CONTRACTOR

SUMMARY AND CLASSIFICATION OF MATERIALS RETURNED TO OWNER BY CONTRACTOR FROM ''I'' REMOVAL UNITS

AMOUNTS TO BE CREDITED TO CONTRACTOR FOR MATERIALS RETURNED

RETURNED MATERIALS DECLARED

REUSABLE BY ENGINEER

ITEM DESIG-

NATION

DESCRIPTION OF MATERIAL

QUANTITY

ITEM VALUE

TABLE D IN CONTRACT

TOTAL CREDIT

TO CONTRACTOR

(Col.12 X Col.13)

QUANTITY

OF ITEMS

STOCK CARD

ITEM PRICE

SALVAGE VALUE

(Col.15 X CoL.16)

10

11

12

13

14

15

16

17









































































































































































TOTAL







RUS FORM 254b (Rev. 2-04)




U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE

CONSTRUCTION INVENTORY

(FOR LABOR AND MATERIAL CONTRACT)

SHEET OF SHEETS

DATE

PROJECT DESIGNATION

CONTRACT NO.

BORROWER

ENGINEER

CONTRACTOR

TABULATION OF NET AMOUNT OF MATERIALS FURNISHED BY OWNER

ITEM DESIG-

NATION


DESCRIPTION OF MATERIAL


QUANTITY

ACTUAL COST TO OWNER

AMOUNT CHARGEABLE TO

CONTRACTOR AT CONT. PRICE

EXCESS OF

COL. 24 OVER

COL. 22

UNIT COST

EXTENDED

COST

(Col.20 X Col,21)

UNIT PRICE

EXTENDED COST

(Col. 20 X Col. 23)

18

19

20

21

22

23

24

25









































































































































































TOTAL







RUS FORM 254c (Rev. 2-04)

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
AuthorBrown, Kimble - RD, MD
File Modified0000-00-00
File Created2025-02-20

© 2025 OMB.report | Privacy Policy