According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-0107, which expires on XXXX. The time required to complete this information collection is estimated to average 2 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection information. All responses to this collection of information are voluntary. Any questions on this burden can be sent to ICRMTRequests@usda.gov
U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE
CONSTRUCTION INVENTORY (FOR LABOR AND MATERIAL CONTRACT) |
SHEET |
OF |
SHEETS |
|
DATE |
PROJECT DESIGNATION |
CONTRACT NO. |
||
BORROWER |
RUS PROJECT CODE(S) |
|||
ENGINEER |
||||
CONTRACTOR |
||||
AMOUNT PAYABLE TO CONTRACTOR
(Total Column 6 RUS Form 254a)
EXISTING FACILITIES AND RETURNED (Total Column 14, RUS Form 254b)
SUBTOTAL
DEDUCT:
REMOVED (Total Column 9, RUS Form 254a)
(In making final payment to Contractor, the net amount due the Contractor, as shown by this Certification, will be reduced by the sums, if any, due the Owner for liquidated damages, payment made to date, or other sums which the owner has the right to retain under the terms of the Contract, and signature by all parties does not preclude the retention by the Owner of such amounts.) |
||||
CERTIFICATE OF ENGINEER I certify that to the best of my knowledge and belief the attached final inventory correctly shows the total number and character of assembly units installed and removed by the Contractor and that the net amount of due the Contractor, as shown above, is true and correct.
ENGINEER By DATE
ACCEPTANCE BY OWNER
OWNER
By
DATE PRESIDENT
ACCEPTANCE BY CONTRACTOR
FIRM By
DATE |
RUS FORM 254 (Rev. 2-04)
-- --
(See RUS Bulletin 176713-3, Preparation and Use of RUS Form 254, for additional instructions)
The Engineer will prepare 5 copies of RUS Form 254 and 254a; also 5 copies of Forms 254b and 254c when applicable,
Calculation of amount payable to Contractor will employ data taken from Nos. 1 thru 25, RUS Forms 254, 254a, 254b, and 254c. The amounts to be inserted opposite Items A, B, C, D, and E on RUS Form 254 are indicated in the texts of those items.
Data shown on Form 254c to be presented under the following headings, as appropriate:
FORTH IN CONSTRUCTION CONTRACT.
PART 11. OTHER MATERIAL ITEMS FURNISHED BY
OWNER.
Nos. 1 thru 17, Forms 254a & 2541b: (Form 254b
is required only when ''I'' removal units are included in the
Contract.)
Nos. 18 through 25: (Form 254c is required only when
there are owner-furnished materials.)
No. Source of Information No. Source of Information
1
and 2
From tabulation
of staking
sheets *
18 and 19
From Contract and Material Receipts
3 and 4 From Contract
No. 3 plus No. 4
From charge-out and credit tickets covering materials issued to and returned by Contractor **
No. 1 multiplied by No. 5
No. 1 multiplied by No. 3
(for ''I'' units only).
From average unit costs on charge-out and credit tickets relating to this construction, such costs in turn being taken from the average unit
From
Table
''C''
of
Contract
No. 1 multiplied by No. 8
for ''I'' removal units only. (Table
C relates solely to "I" units.)
costs reflected by the stock record cards for
the applicable period.
No. 20 multiplied by No. 21
For Part 1, from the unit prices specified in the
1 0, 1 1, & 12 ... From Engineer's and Owner's records
Contract in the ''List of Owner Furnished
From Table D in Contract
No. 12 multiplied by No. 13
From Engineer's records
(Quantities shall be listed opposite the appropriate material items described in No. 1 1.)
From individual stock record card
for each material item listed.
No. 15 multiplied by No. 16
Materials''
For Part 11, from the actual unit costs to Owner--
the same as used in No. 21
No. 20 multiplied by No. 23
No. 24 minus No. 22. (if a minus
quantity, enter in parentheses.)
See 7 CFR 1726, Electric System Construction Policies and Procedures, for instructions regarding distribution of the
completed forms.
Reference should be made to RUS Bulletin 1767B-3, Preparation and Use of the RUS Form 254, for instruction in accounting for all contract costs, including the retirement of units removed by the Contractor and the unitization by record units of costs of construction assemblies installed by the Contractor.
* Standard units will be listed first, followed by new units and conversion units, in that order, with all "I" removal units being listed
last. In Column 2, under ''Unit No.'', enter the unit identifier, and under ''Type'', enter either: "N-New", "H-Conversion" or "I-Removal".
** The quantities shown in No. 20 should agree with materials receipts prepared in connection with the contract.
The types of items of material and the quantity of any item of material listed under Part I of the tabulation should be limited to the type of items and should not exceed the quantity of any item of material specified in the construction contract in the ''List of Owner Furnished Materials.'' Any additional items of material or excess quantities over the items specified in such lists are to be shown under Part 11 of the tabulation.
RUS FORM 254 Instructions (Rev. 2-04)
U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE CONSTRUCTION INVENTORY (FOR LABOR AND MATERIAL CONTRACT) |
SHEET OF SHEETS |
||||||||
DATE |
PROJECT DESIGNATION |
CONTRACT NO. |
|||||||
BORROWER |
|||||||||
ENGINEER |
|||||||||
CONTRACTOR |
|||||||||
ASSEMBLY UNITS |
DUE CONTRACTOR FOR UNITS INSTALLED, CONVERTED AND REMOVED |
AMOUNT CHARGEABLE TO CONTRACTOR FOR MATERIALS IN ASSEMBLIES REMOVED |
|||||||
QUAN- TITY |
UNIT NO. / TYPE N-New H-Conversion I--Removal |
LABOR UNIT PRICE |
EXCEPT I UNITS |
COST TO REMOVE ''I'' UNITS (Col.1 x Col.3) |
|||||
MATERIAL UNIT PRICE |
TOTAL UNIT PRICE (Col.3 + Col.4) |
COST OF CONSTRUCTION (Col.1 x Col.5) |
|||||||
UNIT VALUE (Table C) |
TOTAL (Col.1 x Col.8) |
||||||||
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
/ / |
|
|
|
|
|
|
|
|
|
/
/ |
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
|
RUS FORM 254a (Rev. 2-04)
U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE CONSTRUCTION INVENTORY (FOR LABOR AND MATERIAL CONTRACT) |
SHEET OF SHEETS |
||||||
DATE |
PROJECT DESIGNATION |
CONTRACT NO. |
|||||
BORROWER |
|||||||
ENGINEER |
|||||||
CONTRACTOR |
|||||||
SUMMARY AND CLASSIFICATION OF MATERIALS RETURNED TO OWNER BY CONTRACTOR FROM ''I'' REMOVAL UNITS |
|||||||
AMOUNTS TO BE CREDITED TO CONTRACTOR FOR MATERIALS RETURNED |
RETURNED MATERIALS DECLARED REUSABLE BY ENGINEER |
||||||
ITEM DESIG- NATION |
DESCRIPTION OF MATERIAL |
QUANTITY |
ITEM VALUE TABLE D IN CONTRACT |
TOTAL CREDIT TO CONTRACTOR (Col.12 X Col.13) |
|||
QUANTITY OF ITEMS |
STOCK CARD ITEM PRICE |
SALVAGE VALUE (Col.15 X CoL.16) |
|||||
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
RUS FORM 254b (Rev. 2-04)
U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE CONSTRUCTION INVENTORY (FOR LABOR AND MATERIAL CONTRACT) |
SHEET OF SHEETS |
||||||
DATE |
PROJECT DESIGNATION |
CONTRACT NO. |
|||||
BORROWER |
|||||||
ENGINEER |
|||||||
CONTRACTOR |
|||||||
TABULATION OF NET AMOUNT OF MATERIALS FURNISHED BY OWNER |
|||||||
ITEM DESIG- NATION |
DESCRIPTION OF MATERIAL |
QUANTITY |
ACTUAL COST TO OWNER |
AMOUNT CHARGEABLE TO CONTRACTOR AT CONT. PRICE |
EXCESS OF COL. 24 OVER COL. 22 |
||
UNIT COST |
EXTENDED COST (Col.20 X Col,21) |
||||||
UNIT PRICE |
EXTENDED COST (Col. 20 X Col. 23) |
||||||
18 |
19 |
20 |
21 |
22 |
23 |
24 |
25 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
|
|
|
|
|
RUS FORM 254c (Rev. 2-04)
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | Brown, Kimble - RD, MD |
File Modified | 0000-00-00 |
File Created | 2025-01-23 |