Reinstatement with change of a previously approved collection
No
Regular
02/26/2021
Requested
Previously Approved
36 Months From Approved
3,000
0
1,150
0
28,886
0
The Corps of Engineers uses public
surveys for collecting data for planning, formulation, and
evaluation of projects. Flood damage surveys are administered to
determine the impacts and potential impacts of flooding and to
determine how communities, residents, and businesses respond to
flooding. The data are used for estimating damage and associated
costs of flooding. Damage estimation models are calculated and used
to estimate the cost of flooding and to evaluate the benefits of
alternative flood mitigation plans, which are critical to
determining the feasibility of flood risk management projects.
Results of surveys will help communities to better determine and
communicate their flood risks. The models are also used for
programmatic evaluation of the Army Corps of Engineers’ National
Flood Risk Management Program.
There has been a reduction in
the total number of survey recipients expected in the next three
years and a slight increase in the hourly wage for those completing
the survey and those processing it. In addition, estimated travel
costs are much lower than those calculated in the 2015 submittal.
These changes result in a decrease in respondent burden, but a
slight increase in costs to the federal government.
Nicholas Schuff 757 817-7203
nicholas.a.schuff.ctr@mail.mil
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.