The affected entities are subject to
the General Provisions of the NSPS at 40 CFR part 60, subpart A and
any changes, or additions to the Provisions specified at 40 CFR
part 60, subparts M, P, Q, R, S and Z. Owners or operators of the
affected facilities must make an initial notification, performance
tests, periodic reports, and maintain records of the occurrence and
duration of any startup, shutdown, or malfunction in the operation
of an affected facility, or any period during which the monitoring
system is inoperative. Reports are required semiannually at a
minimum.
There is an adjustment increase
in the respondent burden from the most recently approved ICR. This
increase is not due to any program changes. The increase is due to
a correction in respondent burden activity associated with NSPS
Subpart S. The previous ICR did not include the time required to
prepare semiannual reports for the respondents. This correction
results in an increase in respondent burden hours, costs, and the
total number of responses. There is also an increase in the
respondent labor costs due to an update in labor rates. Further,
there is an overall decrease in O&M costs due to an update in
the number of sources. In this ICR, we estimate that two ferroalloy
facilities are subject to Subpart Z and one primary lead facility
is subject to subpart R; however, the affected sintering unit and
blast furnace at this primary lead facility will be shutdown and
will no longer have burden associated with the standard.
$10,779
No
No
No
No
No
Uncollected
Learia Williams 202 564-4113
williams.learia@epa.gov
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.