Download:
pdf |
pdfU.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
NOTICE: This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275). Failure to comply may
result in criminal fines, civil penalties and other sanctions as provided by law. For further information concerning sanctions and data
protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions. Title 18 USC
1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United
States any false, fictitious, or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1. IDENTIFICATION
Survey Contact
First Name: ______________________________________
Last Name: ____________________________________
Title: ___________________________________________
Telephone (include extension): _______________________
Fax: __________________________________________
Email: __________________________________________
Address: ________________________________________
City: __________________________________________
State: ___________________________________________
Zip: ___________________________________________
Supervisor of Contact Person for Survey
First Name: ______________________________________
Last Name: ____________________________________
Title: ___________________________________________
Telephone (include extension): _______________________
Fax: __________________________________________
Email: __________________________________________
Address: ________________________________________
City: __________________________________________
State: ___________________________________________
Zip: ___________________________________________
Report For
Company Name: ___________________________________________
Plant Name: _______________________________________________
Regulated
□ Yes □ No
Plant ID: ___________ Plant County: ___________________________
CHP
□ Yes □ No
Address: __________________________________________________
CHP Efficiency
City: ___________________________
Zip Code: ____________
State: __________________
%
Reporting Month/Year: _______________________________________
Contacts
For questions related to E-filing:
CNEAFHelpcenter@eia.gov
202-586-9595
For questions about the data requested on this form:
Schedules 1 & 4:
Chris Cassar
christopher.cassar@eia.gov
202-586-5448
Schedule 2:
Rebecca Peterson
rebecca.peterson@eia.gov
202-586-4509
Schedules 3 & 5:
Ron Hankey
rhankey@eia.gov
202-586-2630
Schedules 6, 7, & 8:
Channele Wirman
channele.wirman@eia.gov
202-586-5356
EIA-923 Fax:
202-287-1959 or 202-287-1960
EIA-923 Mailbox:
EIA-923@eia.gov
1
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 2. PAGE 1. COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
CONTRACT INFORMATION, RECEIPTS, AND COSTS
For fossil-fueled plants 50 megawatts and above
□ Is there a fuel tolling agreement in place for this plant? (If
□ No Receipts (If applicable, please check.)
applicable, please check.)
Contract Information
Fuel Supplier Name
Receipts
Contract
Contract
Type
Expiration Date
2
Energy
Source
Cost per Unit
Quantity
Total Delivered
Commodity Cost
Purchased
Cost
(Coal, Natural Gas)
(solids in tons, (cents per MMBtu, (cents per MMBtu,
to the nearest
to the nearest
liquids in barrels,
gases in Mcf)
0.1)
0.1)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 2. PAGE 2. COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Purchases
Quality of Fuel as Received
All Fuels
Carried Forward from Schedule 2. Page 1.
Fuel Supplier
Name
Contract
Type
Energy
Source
50
4
8
Coal, Pet
Coke,
RFO, and
WO
Sulfur
Heat
Content
Quantity
Content
(percent
Purchased (MMBtus to
weight to
nearest
nearest
0.001)
0.01)
3
13
6
3
Fuel Transportation
Coal and
Pet Coke
Coal Only Natural Gas
Ash
Content
(percent
weight to
nearest
0.1)
Predomin
Mercury
ant Mode
Content
(Mode
(ppm to
used to
nearest
Firm or
transport
0.001 or
Interruptible fuel over
enter 9 if
the
not
longest
available)
distance)
6
6
1
Coal, Pet Coke,
and Oil
2
Secondary
Mode
(Mode used
to transport
fuel over the
secondlongest
distance)
2
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 2. PAGE 3. COST AND QUALITY OF FUEL PURCHASES – PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Purchases Information
Coal Mine Information
Carried Forward from Schedule 2. Page 1.
Fuel Supplier Name
Contract Type
Energy Source
Quantity
Purchased
50
4
8
3
4
Coal Mine State
Coal Mine
MSHA ID
Coal
Mine
Type
8
40
3
Coal
Mine
Name
Coal Mine
County
(for imported
coal, enter
IMP)
2
5
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 3. PART A. BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED
PLANTS — FUEL CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers, or for HRSGs in duct burners. If no fuel is consumed for the HRSG at combined cycle
plants, report zero. Do not leave blank. Report consumption in combustion turbines or IC engines on SCHEDULE 3. PART B.
If this does not apply, go to SCHEDULE 3. PART B.
Complete a separate row for each Boiler ID.
□
Did any boiler produce steam for purposes other than electric power generation during this reporting period?
(If applicable, please check.)
Energy Source
Prime
Mover Boiler ID
Code
Boiler
Status
(See Table 8
on pages
22 through
23 in the
Instructions.)
Quantity
Consumed
(Enter zero when
a fuel has no
consumption for
this
reporting period)
Type of
Physical
Units
(tons,
barrels,
or Mcf)
Average
Heat Content
(as burned, to
nearest 0.001
MMBtu per
ton, barrel, or
Mcf)
Sulfur
Content
Ash
Content
(coal, pet coke,
RFO, and WO,
to nearest
0.01%)
(coal and
PC only, to
nearest
0.1%)
If you reported the category of OTH, OBS, OBG, OBL, or OG in the Energy Source column, please identify the category and
specific fuel name below. For example, “The OBG gas is methane.”
_ ___________________________________________________________________________________.
5
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 3. PART B. FUEL CONSUMPTION – PRIME MOVER LEVEL
Report fuel consumed by plants with organic-fueled steam and combined cycle steam capacity under 10 MW, and all combustion
turbines, IC engines, fuel cells, pumped storage hydroelectric units and compressed air units. Aggregate quantity consumed for
prime movers of a single type. In other words, all natural gas consumed by all combustion gas turbines should be reported as one
number. Report pumping energy in megawatthours for pumped-storage plants and compressed air units.
Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.).
□
Was steam produced for purposes other than electric power generation during this reporting period?
(If applicable, please check.)
Prime Mover Code
Energy Source
(See Table 8 on pages 22
through 23 in the
Instr
ctions.)
Quantity Consumed
(Enter zero when a fuel has
no consumption for this
reporting period.)
Type of
Physical Units
Average Heat
Content
(tons, barrels,
or Mcf)
(MMBtu
per ton, barrel,
or Mcf)
If you reported the category of OTH, OBS, OBG, OBL, or OG in the Energy Source column, please identify the category and
specific fuel name below. For example, “The OBG gas is methane.”
_________________________________________________________________________________________________
6
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 4. FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND DATA BALANCE
For Coal, Oil, and Natural Gas Plants
Report stocks for the following fuels:
Coal (tons)
Residual oil (No. 5 and No. 6 fuel oils) (barrels)
Distillate-type oils (including diesel oil, No. 2 oil, jet fuel and kerosene) (barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame-stabilization fuels.
Do not report stocks for waste coal, natural gas, or wood waste. Do enter a comment if the natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site. Each
central storage site must be reported separately. New sites should be indicated in the Comment Section, located in SCHEDULE
9 of this form.
Enter zero if the plant has no stocks. Do not leave blank.
Enter adjustments to stocks. An adjustment can be positive or negative. See instructions for additional information. Provide a
comment to explain adjustments in the adjustments grid.
Enter a comment if the balance does not equal zero in the balance grid.
Energy Source
(See Table 8 in
the Instructions.)
Type of Physical
Units
(tons, barrels, or
Mcf)
Previous
Month’s Ending
Stocks
(1)
Current Month’s
Receipts (2)
Current Month’s
Consumption
(3)
Ending Stocks
(4)
Adjustment to
Stocks* (5)
Balance** (6)
4=(1+2-3+5)
*Explain any adjustments below.
Adjustment
(from Column 5 above)
Energy Source
Explanation
**Previous Month’s Stocks plus Receipts minus Consumption plus (or minus) Adjustment should equal Ending Stocks. The balance
will appear in column (6). If the balance is not zero, provide an explanation below.
Balance
(from Column 6 above)
Energy Source
Explanation
7
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 5. PART A. GENERATOR INFORMATION FOR STEAM-ELECTRIC
ORGANIC-FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of
10 megawatts and above. Report generation for all other types of prime movers (combustion turbines, IC engines, wind, or hydroelectric turbines, and compressed air units.), and steam turbine plants with less than 10 megawatts total capacity or fueled by
nuclear, solar, geothermal, or other energy sources on SCHEDULE 5. PARTS B or C. Generation reported on SCHEDULE 5,
Part A corresponds to the fuel consumption reported on SCHEDULE 3. Part A.
Industrial or Commercial Sector plants may report gross generation ONLY if net generation is not measured (see instructions for
definition of net generation).
Complete a separate row for each Generator ID. See Generator ID information in the instructions for Schedule 5. Part A.
Prime
Mover
Code
Generator
ID
Generator
Status
Gross Generation
(MWh)
8
Net Generation
(MWh)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 5. PART B. PRIME MOVER LEVEL GENERATION
This schedule will be completed ONLY by steam-electric organic-fueled plants with a total steam turbine capacity less than 10
megawatts, by combined-cycle plants whose steam portion of the operation is under 10 MW, and all IC engines, fuel cells,
combustion turbines, pumped-storage hydroelectric turbines, and compressed air units. Generation reported on this schedule
corresponds to the fuel consumption reported on SCHEDULE 3. Part B.
In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime movers of a single type. For
example, enter the total generation from all combustion turbines. Industrial or Commercial Sector plants may report gross
generation ONLY if net generation is not measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.)
Prime Mover Code
Gross Generation
(MWh)
9
Net Generation
(MWh)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 5. PART C. GENERATION FROM NUCLEAR AND OTHER NONCOMBUSTIBLE ENERGY SOURCES
This schedule will be completed by all nuclear plants and by all wind, solar, geothermal, hydroelectric, or other plants where the
energy source is noncombustible, such as purchased steam or waste heat. No fuel consumption is required for these types of
plants. Report generation by energy source for nuclear, wind, solar, geothermal, conventional hydroelectric and miscellaneous
sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant. All combined-cycle
generation is reported on SCHEDULE 5. PART A or B. Report nuclear data by generating unit.
In the applicable Gross Generation or Net Generation cell, enter the aggregate generation for prime movers of a single type. For
example, enter the total generation from all combustion turbines. Industrial or Commercial Sector plants may report gross
generation only if net generation is not measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type. (See Table 7 of the instructions.)
Prime
Mover
Code
Energy
Source
Unit Code
(nuclear)
Gross Generation
(MWh)
10
Net Generation
(MWh)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
POWER PLANT OPERATIONS
REPORT
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 6. NONUTILITY ANNUAL SOURCE AND DISPOSITION OF ELECTRICITY
SCHEDULE 6 collects calendar year data (no monthly detail).
Report all generation in megawatthours (MWh) rounded to a whole number.
Source of Electricity
Disposition of Electricity
(1) Gross Generation (Annual)
(4) Station Use
(2) Other Incoming Electricity
(5) Direct Use (Industrial and Commercial
Sector Plants, both CHP and non-CHP)
(6) Total Facility Use (4 + 5)
(7) Retail Sales to Ultimate Customers
(8) Sales for Resale
(9) Other Outgoing Electricity
(3) Total Sources (1 + 2)
(10) Total Disposition (6 + 7 + 8 + 9)
Total Sources must equal Total Disposition (3 = 10)
11
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 7. ANNUAL REVENUES FROM SALES FOR RESALE
SCHEDULE 7 is to be completed by respondents who entered a positive amount on SCHEDULE 6, Disposition of Electricity, Item 8,
Sales for Resale.
Sales for Resale is energy supplied to other electric utilities, cooperatives, municipalities, Federal and State electric agencies, power
marketers, or other entities for resale to end-use consumers.
Annual Revenues from Sales for Resale (in thousand dollars): ____________________
12
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 8. ANNUAL ENVIRONMENTAL INFORMATION
SCHEDULE 8. PARTS A through F are filed annually by thermoelectric power plants (organic fueled, nuclear, and combined cycle)
with a total steam turbine capacity of 10 megawatts and above (plants that reported on SCHEDULE 3. Part A and SCHEDULE 5 Part
A.). Plants with a total steam turbine capacity of 10 megawatts to less than 100 MW file only Parts C, E, and F.
SCHEDULE 8. PART A. ANNUAL BYPRODUCT DISPOSITION
Enter the quantity of combustion byproducts for the year by type of disposal (to nearest 0.1 thousand tons). Report sales of steam
in million Btu (MMBtu). If actual data are not available, provide an estimated value.
□
NO BYPRODUCTS
Disposal
Sale or Beneficial Use
Storage
Byproduct
Total
On-Site
Landfill
On-Site
Ponds
Disposal
Off-site
Fly ash from standard boiler/PCD
units
Fly ash from un
ts with dry FGD
Fly ash from FBC units
Bottom ash from standard boiler
units
Bottom (bed) ash from FBC units
FGD Gypsum
Other FGD byproducts
Ash from coal gasification (IGCC)
units
Other (specify via footnote on
SCHEDULE 9)
Steam Sales (MMBtu)
13
Sold
Used
On-site
Used
Off-site
Stored
O
-site
Stored
Off-site
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 8. PART B. FINANCIAL INFORMATION RELATED TO COMBUSTION BYPRODUCTS
If actual data are not available, provide an estimated value.
Operation and Maintenance (O&M) Expenditures During Year (Thousand Dollars)
Type
(1)
Fly Ash
(2)
Bottom Ash
(3)
Flue Gas
Desulfurization
(4)
Water
Pollution
Abatement
(5)
Other Pollution
Abatement
(6)
Total
(1 + 2 + 3 + 4 + 5)
Collection
Disposal
Other
Capital Expenditures for New Structures and Equipment During Year, Excluding Land and Interest Expense
(Thousand Dollars)
Type
(7)
Air Pollution
Abatement
(8)
Water Pollution
Abatement
(9)
Solid/Contained Waste
(10)
Other Pollution Abatement
Amount
Byproduct Sales Revenue During Year
(Thousand Dollars)
Type
(11)
Fly Ash
(12)
Bottom Ash
(13)
Fly and Bottom
Ash Sold
Intermingled
Amount
14
(14)
Flue Gas
Desulfurization
Byproducts
(15)
Other
Byproduct
Revenue
(16)
Total
(11+12+13+14+15)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 8. PART C. BOILER INFORMATION NITROGEN OXIDE EMISSION CONTROLS
Complete a separate row for each boiler.
Note: The Boiler ID must match the Boiler ID as reported on Form EIA-860, "Annual Electric Generator Report."
□
No NOx Controls
NOx Emission Rate (lbs/MMBtu)
Boiler ID
NOx Control In-Service
(hours)
Entire Year
15
May through September
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: _____________________________________________________________________________________________________________________
Plant ID: ________________________________________
State: __________________________
Reporting Year: _______________________
SCHEDULE 8. PART D. MONTHLY COOLING SYSTEM INFORMATION
Reporting Month:__________________
Note: All steam-electric plants of 100 MW nameplate capacity or greater, including combined cycle plants and nuclear power plants, must respond to this schedule. Cooling System ID must
match the ID as reported on Form EIA-860, "Annual Electric Generator Report.” Complete a separate page for each month. Complete a separate row for each cooling system.
Cooling
System
ID or
Plant
Cooling
System
Status
Monthly
Amount
of
Chlorine
Added to
Cooling
Water
(1000 lbs)
Average Monthly Rate of Cooling Water
3
(in cubic feet per second, to the nearest 0.1 ft )
Hours in
Service
Diversion
Withdrawal
Discharge
Cooling Water
Temperature at Intake
(degrees Fahrenheit)
Measured or
Estimated? (If any
Average
Maximum
Consumption flow rate data was
Monthly
Temperature
estimated, select
Temperature for the Month
methodology.)
16
Cooling Water Temperature
at Discharge Outlet
(degrees Fahrenheit)
Average
Monthly
Temperature
Maximum
Temperature
for the Month
Measured or
Estimated? (If
any temperature
data was
estimated, select
methodology.)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ___________________________________________________________________________________________________________________
Plant ID: ________________________________________
State: __________________________
Reporting Year: _____________________________
SCHEDULE 8. PART E. FLUE GAS PARTICULATE COLLECTION INFORMATION
□ Does not apply.
Complete a separate row for each flue gas particulate collector.
Flue Gas
Particulate
Collector ID
FGP Collector
Status
Hours in
Service
Typical Particulate
Emissions Rate
(to the nearest 0.01
lb/MMBtu)
Removal Efficiency of Particulate Matter (nearest 0.1% by weight)
At Annual Operating
Factor
17
At 100% Load or
Tested Efficiency
Date of Most Recent
Efficiency Test (e.g., 12-2005)
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: _____________________________________________________________________________________________________________________
Plant ID: __________________________________
State: __________________________
Reporting Year: ___________________________________
SCHEDULE 8. PART F. FLUE GAS DESULFURIZATION UNIT INFORMATION – ANNUAL OPERATIONS
Note: Flue Gas Desulfurization ID must match the ID as reported on Form EIA-860, "Annual Electric Generator Report.”
□ Does not apply.
Complete a separate row for each Flue Gas Desulfurization Unit.
ANNUAL OPERATIONS
Flue Gas
Desulfurization Unit
ID
FGD Unit
Status
Hours InService
Quantity of FGD
Sorbent Used
(to the nearest 0.1
thousand tons)
Electrical Energy
Consumption
(MWh)
Removal Efficiency of Sulfur Dioxide (nearest 0.1% by wt)
At Annual Operating
Factor
At 100% Load or
Tested Efficiency
Date of Most Recent Efficiency
Test (e.g., 12-2005)
OPERATION AND MAINTENANCE EXPENDITURES DURING YEAR, EXCLUDING ELECTRICITY (THOUSAND DOLLARS)
Flue Gas
Desulfurization Unit
ID
Feed Materials
and Chemicals
Labor and
Supervision
Waste Disposal
18
Maintenance, Materials,
and All Other Costs
Total
U.S. Department of Energy
U.S. Energy Information Administration
Form EIA-923 (2011)
POWER PLANT OPERATIONS
REPORT
Form Approval
OMB No. 1905-0129
Approval Expires: 12/31/2013
Burden: 2.8 Hours
Plant Name: ____________________________________________________________________
Plant ID: _________________________________
State: ______
Reporting Month/Year: ____________________
SCHEDULE 9. COMMENTS
Comment Section: Explain any unusual values, occurrences, or changes in ownership.
Schedule
Part
Item
Comment
Changes in Ownership
(Provide name of purchaser and date sold.)
19
File Type | application/pdf |
File Title | Appendix C |
Author | Grace Sutherland |
File Modified | 2010-09-30 |
File Created | 2010-09-30 |