Corps of Engineers Civil Works Questionnaires Generic Clearance

Supporting Statement B

DOCK AND TERMINAL SURVEY.DOC

Corps of Engineers Civil Works Questionnaires Generic Clearance

OMB: 0710-0001

Document [doc]
Download: doc | pdf


DOCK AND TERMINAL SURVEY



(Personal Interview)


OMB 0710-0001


Expires: 30 September 2012












The public report burden for this information collection is estimated to average 60 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503, Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.


DOCK AND TERMINAL SURVEY


Terminal Name:_______________________________________


Is this a public or privately owned terminal? (CIRCLE)


1. PUBLIC

2. PRIVATELY OWNED


Terminal Operator (Firm): ______________________________________


Mailing Address: ________________________________________


State: ________________________Zip Code:____________


Parent Firm/Terminal Owner:____________________________________


Mailing Address: _________________________________________


State: ________________________Zip Code:_____________



1. Terminal Number: _________


2. Corps CODE numbers for each dock at the terminal:


_______ _______ _______ _______ _______



3. River mile location of terminal:

MILE NUMBER_________


4. Latitude and Longitude of Terminal Geographic Location:


______Degrees North Latitude


______Degrees West Longitude


5. Standard Industrial Classification (SIC) Code: ________


6. What is the total land area in acres for these terminal and dock facilities?


_______ACRES


7. How many total feet of waterfront footage is there for these terminal and dock facilities?

_______FEET


8. Please list the names of all your docks below and give the length, width, and water depth for each dock:


Length Width Depth of

Docks: (Feet) (Feet) Water (Ft.)


1.______________:______FT. ______FT. ______FT.


2.______________:______FT. ______FT. ______FT.


3.______________:______FT. ______FT. ______FT.


4.______________:______FT. ______FT. ______FT.


5.______________:______FT. ______FT. ______FT.



9. Please list the different types of loading and unloading equipment at this terminal and dock facility, the number of pieces of each type, their average loading and

unloading rates, average age, and total replacement costs for all pieces of each

type:

Total Rates Of

Number Years Cost to Loading/

Types of Equipment: Pieces Old Replace Unloading

1._______________: ____ ___ $_______ ______ ___/HR


2._______________: ____ ___ $_______ ______ ___/HR


3._______________: ____ ___ $_______ ______ ___/HR


4._______________: ____ ___ $_______ ______ ___/HR


5._______________: ____ ___ $_______ ______ ___/HR


6._______________: ____ ___ $_______ ______ ___/HR


10. Please list the different types of storage facilities at this terminal and dock facility

and tell whether or not facilities are under cover (e.g. roof), their storage capacity, and the types of commodities stored by each type of facility.


Types of Covered Storage Types of

Storage Facilities? Capacity Commodities

Facilities: (Circle) Amount Units Stored


1. _____________ Yes No ________ ____ ­______________

______________

______________


2. _____________ Yes No ________ ____­ ______________

______________

______________


3. _____________ Yes No ________ ____ ­______________

______________

______________




11. Please list the PRIMARY COMMODITIES below for which you received shipments during the last 12 months. Give the total tons of each commodity received during this time, the seasons of year when received, origin, ultimate destination, and distance shipped.



Tons in Seasons Mode1 of

Primary Last 12 Received Shipping Distance Ultimate Shipment

Commodities2 : Months (Circle) Origin Shipped Destination (Circle)


1.____________: ______ SP SU F W __________;____mi__________ T R B S P


2.____________: ______ SP SU F W __________;____mi__________ T R B S P


3.____________: ______ SP SU F W __________;____mi__________ T R B S P


4.____________: ______ SP SU F W __________;____mi__________ T R B S P


5.____________: ______ SP SU F W __________;____mi__________ T R B S P


6.____________: ______ SP SU F W __________;____mi__________ T R B S P


1 T = Truck, R = Rail, B = Barge, S = Steamship, P = Pipeline


2 Repeat Commodity for different Origins and Destinations.



12. Which of the following ground transportation services do you have available at

your terminal?

(CIRCLE ALL THAT APPLY)


1. TRUCK

2. RAIL SERVICE

3. PIPELINE

4. OTHER (Please List:)__________________________



13. Please give the total numbers of full-time and part-time employees for each type of

work listed below, together with the hourly pay range and hourly fringe benefits for each.




Type of Work:


Hourly Pay



Fringe Benefits

(Hourly

Value)


Number of Employees


Full Time


Part Time


1. Physical Plant










2. Dock Workers










3. Stevedores










4. Longshoremen










5. Other Types










14. What are your charges (rates per ton) for the primary commodities you handle, for the various unloading and translocation services specified below. If you have a published rate schedule, you may attach that in lieu of completing questions 14-16.

Rail Wharfage/ Loss &

Switching Dockage Rehandling Storage Damage

Commodity Names: Rate/Ton Rate/Ton Rate/Ton Rate/Ton Charge/Ton


1 ._______________: $_______ $_______ $_______ $_______ $_______


2 ._______________: $_______ $_______ $_______ $_______ $_______


3 ._______________: $_______ $_______ $_______ $_______ $_______


4 ._______________: $_______ $_______ $_______ $_______ $_______


5 ._______________: $_______ $_______ $_______ $_______ $_______


6 ._______________: $_______ $_______ $_______ $_______ $_______


7 ._______________: $_______ $_______ $_______ $_______ $_______


8 ._______________: $_______ $_______ $_______ $_______ $_______

15. Are there any OTHER charges for the primary commodities you handle?


1 NO 2 YES (Please Specify:)


_________________________________________________________________


_________________________________________________________________


_________________________________________________________________


16. What are the transfer charges on the following intermodal combinations of transport?

Rail Barge Truck Pipeline


Transfer from:


1. Rail to: _______$/Ton _______$/Ton _______$/Ton _______$/Ton


2. Barge to: _______$/Ton _______$/Ton _______$/Ton _______$/Ton


3. Truck to: _______$/Ton _______$/Ton _______$/Ton _______$/Ton


4. Pipeline to: ______$/Ton _______$/Ton _______$/Ton _______$/Ton



17. Have users of your terminal and/or dock facilities experienced any problems related to the waterway?


1 NO

2 YES (Please Specify:)


__________________________________________________________


__________________________________________________________


__________________________________________________________



18. If Yes, how would correcting the problem(s) affect terminal operations, including effects on costs, throughput levels, and future market or supply sources?


________________________________________________________________

________________________________________________________________



19. Please give any recommendations you may have for improvements in the waterway which the Corps of Engineers could make in the future.


________________________________________________________________


________________________________________________________________

________________________________________________________________



File Typeapplication/msword
File TitleDOCK AND TERMINAL SURVEY
AuthorStuart Davis
Last Modified ByStuart A. Davis
File Modified2009-05-21
File Created2007-11-14

© 2024 OMB.report | Privacy Policy