DOCK AND TERMINAL SURVEY
(Personal Interview)
OMB 0710-0001
Expires: 30 September 2012
The public report burden for this information collection is estimated to average 60 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this data collection, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Executive Services Directorate, Information Management Division, and the Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, D.C. 20503, Attn.: Desk Officer for U.S. Army Corps of Engineers. Respondents should be aware that notwithstanding any other provision of law, an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Please DO NOT RETURN your completed form to either of these offices.
DOCK AND TERMINAL SURVEY
Terminal Name:_______________________________________
Is this a public or privately owned terminal? (CIRCLE)
1. PUBLIC
2. PRIVATELY OWNED
Terminal Operator (Firm): ______________________________________
Mailing Address: ________________________________________
State: ________________________Zip Code:____________
Parent Firm/Terminal Owner:____________________________________
Mailing Address: _________________________________________
State: ________________________Zip Code:_____________
1. Terminal Number: _________
2. Corps CODE numbers for each dock at the terminal:
_______ _______ _______ _______ _______
3. River mile location of terminal:
MILE NUMBER_________
4. Latitude and Longitude of Terminal Geographic Location:
______Degrees North Latitude
______Degrees West Longitude
5. Standard Industrial Classification (SIC) Code: ________
6. What is the total land area in acres for these terminal and dock facilities?
_______ACRES
7. How many total feet of waterfront footage is there for these terminal and dock facilities?
_______FEET
8. Please list the names of all your docks below and give the length, width, and water depth for each dock:
Length Width Depth of
Docks: (Feet) (Feet) Water (Ft.)
1.______________:______FT. ______FT. ______FT.
2.______________:______FT. ______FT. ______FT.
3.______________:______FT. ______FT. ______FT.
4.______________:______FT. ______FT. ______FT.
5.______________:______FT. ______FT. ______FT.
9. Please list the different types of loading and unloading equipment at this terminal and dock facility, the number of pieces of each type, their average loading and
unloading rates, average age, and total replacement costs for all pieces of each
type:
Total Rates Of
Number Years Cost to Loading/
Types of Equipment: Pieces Old Replace Unloading
1._______________: ____ ___ $_______ ______ ___/HR
2._______________: ____ ___ $_______ ______ ___/HR
3._______________: ____ ___ $_______ ______ ___/HR
4._______________: ____ ___ $_______ ______ ___/HR
5._______________: ____ ___ $_______ ______ ___/HR
6._______________: ____ ___ $_______ ______ ___/HR
10. Please list the different types of storage facilities at this terminal and dock facility
and tell whether or not facilities are under cover (e.g. roof), their storage capacity, and the types of commodities stored by each type of facility.
Types of Covered Storage Types of
Storage Facilities? Capacity Commodities
Facilities: (Circle) Amount Units Stored
1. _____________ Yes No ________ ____ ______________
______________
______________
2. _____________ Yes No ________ ____ ______________
______________
______________
3. _____________ Yes No ________ ____ ______________
______________
______________
11. Please list the PRIMARY COMMODITIES below for which you received shipments during the last 12 months. Give the total tons of each commodity received during this time, the seasons of year when received, origin, ultimate destination, and distance shipped.
Tons in Seasons Mode1 of
Primary Last 12 Received Shipping Distance Ultimate Shipment
Commodities2 : Months (Circle) Origin Shipped Destination (Circle)
1.____________: ______ SP SU F W __________;____mi__________ T R B S P
2.____________: ______ SP SU F W __________;____mi__________ T R B S P
3.____________: ______ SP SU F W __________;____mi__________ T R B S P
4.____________: ______ SP SU F W __________;____mi__________ T R B S P
5.____________: ______ SP SU F W __________;____mi__________ T R B S P
6.____________: ______ SP SU F W __________;____mi__________ T R B S P
1 T = Truck, R = Rail, B = Barge, S = Steamship, P = Pipeline
2 Repeat Commodity for different Origins and Destinations.
12. Which of the following ground transportation services do you have available at
your terminal?
(CIRCLE ALL THAT APPLY)
1. TRUCK
2. RAIL SERVICE
3. PIPELINE
4. OTHER (Please List:)__________________________
13. Please give the total numbers of full-time and part-time employees for each type of
work listed below, together with the hourly pay range and hourly fringe benefits for each.
Type of Work: |
Hourly Pay |
Fringe Benefits (Hourly Value) |
Number of Employees |
|
Full Time |
Part Time |
|||
1. Physical Plant |
|
|
|
|
2. Dock Workers |
|
|
|
|
3. Stevedores |
|
|
|
|
4. Longshoremen |
|
|
|
|
5. Other Types |
|
|
|
|
14. What are your charges (rates per ton) for the primary commodities you handle, for the various unloading and translocation services specified below. If you have a published rate schedule, you may attach that in lieu of completing questions 14-16.
Rail Wharfage/ Loss &
Switching Dockage Rehandling Storage Damage
Commodity Names: Rate/Ton Rate/Ton Rate/Ton Rate/Ton Charge/Ton
1 ._______________: $_______ $_______ $_______ $_______ $_______
2 ._______________: $_______ $_______ $_______ $_______ $_______
3 ._______________: $_______ $_______ $_______ $_______ $_______
4 ._______________: $_______ $_______ $_______ $_______ $_______
5 ._______________: $_______ $_______ $_______ $_______ $_______
6 ._______________: $_______ $_______ $_______ $_______ $_______
7 ._______________: $_______ $_______ $_______ $_______ $_______
8 ._______________: $_______ $_______ $_______ $_______ $_______
15. Are there any OTHER charges for the primary commodities you handle?
1 NO 2 YES (Please Specify:)
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
16. What are the transfer charges on the following intermodal combinations of transport?
Rail Barge Truck Pipeline
Transfer from:
1. Rail to: _______$/Ton _______$/Ton _______$/Ton _______$/Ton
2. Barge to: _______$/Ton _______$/Ton _______$/Ton _______$/Ton
3. Truck to: _______$/Ton _______$/Ton _______$/Ton _______$/Ton
4. Pipeline to: ______$/Ton _______$/Ton _______$/Ton _______$/Ton
17. Have users of your terminal and/or dock facilities experienced any problems related to the waterway?
1 NO
2 YES (Please Specify:)
__________________________________________________________
__________________________________________________________
__________________________________________________________
18. If Yes, how would correcting the problem(s) affect terminal operations, including effects on costs, throughput levels, and future market or supply sources?
________________________________________________________________
________________________________________________________________
19. Please give any recommendations you may have for improvements in the waterway which the Corps of Engineers could make in the future.
________________________________________________________________
________________________________________________________________
________________________________________________________________
File Type | application/msword |
File Title | DOCK AND TERMINAL SURVEY |
Author | Stuart Davis |
Last Modified By | Stuart A. Davis |
File Modified | 2009-05-21 |
File Created | 2007-11-14 |