Approved,
through June, 1996. The requested pretest is approved and the full
survey is approved conditional on the evaluation of the pretest and
review of the final full survey instrument. As indicated by
memorandum of September 6, 1994, FHWA plans to evaluate the pretest
through a combination of reinterviewing and conducting additional
focus group work. FHWA believes that this approach will yield
information how best to reduce survey length and respondant burden
associated with the 1995 NPTS. The approval is conditional on
submission of the final survey instrument and pretest evaluation
prior to initiating the full survey. Changes provided in memo of
10/5/94 fr FHWA are also approved.
Inventory as of this Action
Requested
Previously Approved
06/30/1996
06/30/1996
27,500
0
0
30,250
0
0
0
0
0
THE NPTS OBTAINS INFORMATION FROM A
NATIONAL SAMPLE OF HOUSEHOLDS ON T AMOUNT AND NATURE OF PERSONAL
TRAVEL IN THE U.S. RESULTS ARE USED BY THE U.S. DEPARTMENT OF
TRANSPORTATION TO ADDRESS NATIONAL TRANSPORTATI POLICY ISSUES,
FORECAST FUTURE TRAVEL DEMAND, ANALYZE TRANSIT USE, AND CALCULATE
TRAFFIC ACCIDENT EXPOSURE RATES.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.