This approval
covers the information collection requirements promulgat as of
November, 1985. EPA should submit an ICR to OMB for any propose
revisions in accordance with 5CFR1320.13
Inventory as of this Action
Requested
Previously Approved
12/31/1988
12/31/1988
40
0
0
1,350
0
0
0
0
0
SOURCES MUST NOTIFY EPA OF
CONSTRUCTION, MODIFICATIONS, STARUPS, SHUTDOWNS, MALFUNCTIONS, DATE
AND RESULT OF PERFORMANCE TEST. OWNERS/OPERATORS SHALL MAINTAIN AN
INSTRUMENT TO RECORD DAILY THE TIME/DURATION OF EACH STEEL
PRODUCTION CYCLE AND EXHAUST GAS DIVERSION FROM THE MAIN STACK.
FACILITIES USING VENTRI SCRUBBERS SHALL INSTALL, CALIBRATE AND
MAINTAIN DEVICES TO CONTINUOUSLY MEASURE PRESSURE LOSS
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.